Actual adoption results / Actual adopted examples

Map of adoption results

Actual adoption results / Actual adopted examples

Note1: Data includes the results of verification testing.
Note2: Verification testing is calculated on the scale of the entire plant.
Note3: Includes portion of orders determined to be received as of July 2018.

Adoption example 1: Paraca Kasumigaura Power Plant
(Paraca Inc., SSU: 486 units, MU: 2 units)

Adoption example1

Completed: October 2015, introduction: October 2015 (Newly built)
Approximate output: 1,700 kW
Installed location: Kasumigaura-shi, Ibaraki

 

Adoption example 2: Chino Photovoltaic Power Plant
(Japan Local Energy Initiative, Inc. (LEI), SSU: 252 units, MU: 1 unit)

Adoption example2

Completed: April 2015, introduction: August 2015 (Already existed)
Approximate output: 2,000 kW
Installed location: Chino-shi, Nagano

 

Adoption example 3: Hongo Photovoltaic Power Plant
(SSU: 138 units, MU: 1 unit)

Adoption example3

Completed: November 2014, introduction: July 2015 (Already existed)
Approximate output: 463 kW
Installed location: Takasaki-shi, Gunma

 

Adoption example 4: Kakegawa Photovoltaic Power Plant
(Fujimori Sangyo Co., Ltd., SSU: 314 units, MU: 2 units)

Adoption example4

Completed: July 2013, introduction: January 2015 (Already existed)
Approximate output: 1,177 kW
Installed location: Kakegawa-shi, Shizuoka

 

Adoption example 5: Paraca Shuzenji Photovoltaic Power Plant
(Paraca Inc., SSU: 302 units, MU: 3 units)

Adoption example5

Completed: March 2015, introduction: March 2015 (Newly built)
Approximate output: 1,150 kW
Installed location: Izu-shi, Shizuoka

Contact here for products and technical inquires


For inquiries and consultations, PV Wireless String Monitoring System solmiv(TM) “PV Micro Converter solhueru(TM)” MPPT Control

Results of Adoption
Wireless Sensor Network